The INDEX, Inc. supplier is still working on the pressure problem of the machine.
The ADSE Contractor is currently completing the phase 1 of the project.
The water supply of the deepwell is currently provided in Barangay Tabon and is under monitoring and evaluation of BCWD. This project is in close coordination with the 7H Water Supply, Inc.
BCWD General Manager Menillo C. Siega and Mactan Rock Industries, Inc. Pres. Lito R. Maderazo inked the contract on the Design and Build of 4000 CMD Water Clarifier and Upgrading of the Existing Filter Basin on April 12, 2010.
For awarding.
Design and Installation of Meter Reading, Billing and Collection System (MRBCS)
BCWD is currently undertaking the trial run of the said MRBCS since August 1, 2010.
|
|
 |
|
 |